Rapid remodelling to create art and fashion studios and a photography suite with the addition of a mezzanine floor.

Project

This scheme involved structurally changing the old sports centre to create a performing arts studio with a mezzanine floor. We divided up rooms with unusually high 8-9 metre ceilings to create useable learning spaces. Extensive internal piling was required to support the new steel framed mezzanine floor.

We stripped out the building, upgraded the M&E, altered the building envelope to create new window and door openings, installed new windows, and built one internal and one external fire escape staircase.

Additional works were applied to the contract to refurbish a further ground floor at The University, which we managed to complete within the short 18 week period.

This phase was conducted simultaneously as another job on the same site by the same site manager, saving costs for the customer.

Challenges

  • Delivered in 18 weeks
  • Extra works added to the contract
  • Internal piling
  • Changes to the lift spec added 4 weeks to the contract
  • External spiral staircase

Solutions

An extensive amount of contracted and additional work was completed within 18 weeks, which meant trades had to be sequenced in a military fashion with most craftsmen working evenings and weekends.

Internally drilling 45 piles into the ground to support the mezzanine floor consumed a lot of the programme as did the addition of work to refurbish an entire floor.

The lift steelwork was redesigned, adding a 4 week lead in time to the already bulging programme. Efficient working meant we were able to overcome this.

Attaching the spiral staircase to the externals of the building was challenging, so we took it apart and installed it in sections.

“Beard continue to be a valued contractor to The University of Gloucestershire. They have completed 3 recent projects for us and we have found them to be a capable and approachable team. They are easy to work with as they communicate well through our agreed reporting arrangements.  They have been proactive at finding solutions to problems as they inevitably crop up.  They offer value for money and I would not hesitate to recommend them.”

Dr Nigel Wichall

Director of Estates, MBA, DBA, FCIOB

University of Gloucestershire

Customer

University of Gloucestershire

Contract value

£1.2 million

Architect

Heath Avery

Quantity Surveyor

Provelio

Contract duration

18 weeks

Form of contract

Design and Build

Procurement Method

Two Stage