THE PROJECT
The external refurbishment included the replacement of existing roof materials, redecoration of the steel frame along with repairs to the external cladding and fire escapes. Internally the existing Mechanical and Electrical and fire suppression systems were overhauled.
£4.7M
CONTRACT VALUE
54 WEEKS
CONTRACT DURATION
Customer
AEW UK Core
Property Fund
Architect
Sir Norman Foster
Associated
Quantity Surveyor
Lee Husband
Form of Contract
Single Stage
Colour-matching the iconic yellow paint
Due to sun damage and previous repair works, the original yellow paint had overlayed with various shades, this created a challenge when procuring the yellow paint for the external steelwork. Beard and Bagnalls Decorations used an inconspicuous area inside the building to test multiple samples and find the matching modern colour.
Live operational building
Cooper Tyres and a scrap organisation both currently occupy the building and remained operational while the works were being completed.
1,459 l
Yellow
Basecoat
1,226 l
Topcoat
898 l
Frame Grey
MIO
65,438 l
Poly Roof Liquid
Grade II
Listed
Building
25,000 m2
Building